Hennessy Construction Services - Jordan School Renovation
This project is a historical renovation of the original 1925 portion of  Jordan School and will be used for Pinellas County's Head Start program. The project was built under LEED guidelines, and achieved a LEED Silver rating. Some LEED related items included solar energy panels, solar water heating, grey-water system and Cool-Kap roof.

Work included renovation of approximately 13,000 sf of the existing 2-story 1925 building, and demolition of the 1947 addition. The existing structure is hollow clay tile with brick veneer. Scope included reinforcing the walls and then removing, cleaning, and re-laying the existing brickwork. Interior finishes were restored to their 1925-era style utilizing cement and gypsum plaster. An elevator was retrofitted into the building, along with all new interior finishes, historical doors, windows and millwork. A new mechanical building to house the HVAC equipment and provide storage for playground equipment was also built on the site.
Education Projects
Education Projects

At Hennessy, we major in completing our projects on time and on budget.  Our experience includes classrooms, laboratories, dormitories, gymnasiums, dining halls, administration buildings, student union and multi-purpose facilities, both renovation and new construction. We have been building on campuses with on-going operations, ensuring the safety of students, faculty, staff and visitors without interrupting school activities or class schedules for more than 50 years.

Exterior Rear

Historic Photo - date unknown

 
Aerial
 
Underground Piping
Accelerated Schedule for chilled water piping to be completed within 10 days while school was out of session.
 
Future Office Space | Before
Interior second floor
 
Hall | Before
Second floor Administrative Cooridor
 
Exterior Corridor
 
Exterior Front
 
Interior Hall
 
Exterior Stairs
 
Exterior 2
 
Exteiror 3
 
Classroom
 
Interior Hall
 
Gates in arches at open air hallway of first floor
 
Former coat closet turned into Electrical hub of the buildling
 
Classroom
 
Adult Edcucation Area
 
Completed Exterior
 
Exterior Side
 
Staircase from First Floor
 

 

Back To Home Project