The new 13,000 sf elevated addition to the City’s recreation center complex has meeting rooms, a multipurpose room, restroom facilities, and administrative offices. Renovations to the existing gymnasium building include new HVAC system for the entire facility, and new operations/maintenance offices.
Outside there is a new six lane swimming pool with slide and water features, pool pavilion with restroom facilities, pump/chemical storage room, and a separate community outdoor pavilion that can be used for small concerts and the like.
Other work included associated on-site and off-site improvements such as driveways, parking lot, dumpster enclosure, landscaping, storm drainage, site utilities, sidewalks, etc.
Outside there is a new six lane swimming pool with slide and water features, pool pavilion with restroom facilities, pump/chemical storage room, and a separate community outdoor pavilion that can be used for small concerts and the like.
Other work included associated on-site and off-site improvements such as driveways, parking lot, dumpster enclosure, landscaping, storm drainage, site utilities, sidewalks, etc.